Richcam Auto Engineering transformed its precision manufacturing operations with SourcePro ERP by reducing duplicate data entry by 90%, improving production visibility, and achieving better control over inventory, execution, and material planning across departments.
About Richcam Auto Engineering Pvt. Ltd.
Richcam Auto Engineering Pvt. Ltd. operates in a precision-driven manufacturing environment, specializing in press tools, sheet metal dies, CNC machining, and fabrication.
With multiple stages across design, machining, and production, their operations require strong coordination, accurate inventory handling, and
controlled execution.

Industry
Press Tool Manufacturing, Sheet Metal Dies & Tooling, CNC Machining & Fabrication

Business Model
Precision Manufacturing & Fabrication

Core Offering
CNC Machining, Tooling, Production Execution

Key Requirement
Process visibility, production tracking, and inventory control
Challenges Before ERP
Duplicate data entry across systems, leading to inconsistencies
Limited visibility into production and process flow
Difficulty in tracking production stages and controlling execution
Challenges in handling LBT items during production
Inventory mismatches due to lack of structured size/dimension tracking
After SourcePro ERP

End-to-end visibility across departments

Structured production tracking and better control

Dimension-wise size stock tracking for better inventory accuracy

Effective handling of LBT item challenges

Customizations aligned with operational requirements

Significant reduction in duplicate data entry
Operational Impact
20–30 %
Improvement in operational efficiency
90 %
Reduction in duplicate data entry
100 %
Process visibility across departments
Business Impact
Better control over production execution
More structured and reliable material planning
Improved overall operational consistency
Feature Highlight
Dimension-wise Size Stock Keeping

Accurate tracking of materials across sizes and dimensions

Reduced inventory mismatch by approx. 25%

Improved material planning and utilization
Support & Implementation

Implementation Duration: 6 months

Smooth implementation with continuous handholding

Faster response time for support queries



