Meet SourcePro Team at Boiler India 2026

How Indoko Engineers Reduced Project Delays by Bringing Visibility and Control with SourcePro ERP

Indoko Engineers improved project execution and reduced operational delays by implementing SourcePro ERP, enabling real-time visibility, streamlined workflows, and better coordination across departments through a fully integrated system.

About Indoko Engineers

Indoko Engineers operates in a project-based manufacturing environment, specializing in the design, manufacturing, installation, and commissioning of BIW welding fixtures and press tool dies.

Each project moves across multiple stages, including design, procurement, manufacturing, and on-site execution, requiring tight coordination between departments.

As operations expanded, managing these interdependent activities manually made it increasingly difficult to maintain visibility, alignment, and timely execution.

Industry

Machinery & Equipment

Business Model

Project-Based Manufacturing

Core Offering

BIW Welding Fixtures & Press Tool Dies

Challenges Before ERP

  • Purchase, store, and design handled
    manually
  • No system connecting departments
  • No centralized tracking for operations
  • No real-time view across departments
  • Inventory inaccuracies (~25–30%)
  • Limited clarity on ongoing projects
  • Inefficient project tracking
  • Poor coordination between teams
  • Heavy reliance on manual follow-ups

What Changed with SourcePro ERP

Before SourcePro ERP
Disconnected departments
Disconnected departments
Manual operations
Manual operations
No tracking
No tracking
Reactive coordination
Reactive coordination
After SourcePro ERP
Fully integrated system
Fully integrated system
Streamlined workflows
Streamlined workflows
Real-time visibility
Real-time visibility
Structured & aligned execution
Structured & aligned execution

Operational Improvements & Impact

100% departmental integration on a single platform
Real-time tracking improved decision-making
Streamlined workflows reduced delays
Better coordination improved delivery timelines

From the Client

Schedule ERP Demo


Schedule a Demo