How Utkarsh Transmission Achieved 100% Centralized Operational Control Across 3 Plants with SourcePro ERP

Utkarsh Transmission achieved centralized operational control across three manufacturing plants with SourcePro ERP, enabling real-time production tracking, improved planning accuracy, reduced operational costs, and stronger coordination across departments.

About Utkarsh Transmission

Utkarsh Transmission is a manufacturer of high-end flexible couplings used in power transmission applications.

With a strong focus on precision engineering, product reliability, and performance, the company serves both domestic and global markets.

Operating across multiple plants and handling complex manufacturing requirements, their processes demand tight coordination between planning, production, procurement, and quality control.

Industry

Industrial Equipment Manufacturing

Core Offering

High-end Flexible Couplings

Business Model

Project-Based & Custom Manufacturing

Production Environment

High-mix, process-driven manufacturing

Challenges Before ERP

  • Heavy reliance on manual processes and follow-ups
  • Limited system-driven coordination across departments
  • No unified system connecting all three plants
  • No real-time tracking of production & procurement causing information gaps across departments
  • Difficulty maintaining optimal inventory levels
  • Inefficient production planning affecting delivery timelines
  • Increasing complexity with business growth
  • Lack of structured systems to support expansion

After SourcePro ERP

100% Centralized Operations
100% Centralized Operations
Across All 3 Plants
100% Real-Time Tracking
100% Real-Time Tracking
For Production & Procurement Activities
20-25% Improvement in
20-25% Improvement in
Product Consistency
95% User Adoption
95% User Adoption
With Intuitive & Web-Based Interface
2X Business Scalability
2X Business Scalability
Without Increasing Complexity
15-20% Reduction
15-20% Reduction
In Excess Stock & Shortages
20-25% Improvement
20-25% Improvement
In On-time Delivery
10-15% Reduction
10-15% Reduction
In Operational Costs
90% Issues Resolved
90% Issues Resolved
Within 24 Hours

From the Client

Schedule ERP Demo